The SLCDA secured a Federal Aviation Administration grant to design and construct the shell of a west utility tunnel between the two concourses. We’ve been able to do that by building out portions of the new airport’s infrastructure more than a decade before we needed them.One forward-positioning example happened in 2004. Therefore, you must position the program to meet moments of opportunity when they arise. Large, transformative airport programs are like aircraft carriers. The successful completion of phase one of the SLCDA’s $4.1 billion Airport Redevelopment Project is directly linked to six strategies that helped turn our vision into a reality: Ready to accommodate 34 million passengers annually, the new facility replaces an existing terminal and five pier concourses, all built in the 1960s and ‘70s. The New SLC is the largest capital construction project in Utah’s history and the nation’s newest hub airport. The tunnel is temporary until the permanent, central passenger tunnel, part of phase two, now underway, is completed. The concourses are currently connected via the mid-concourse tunnel. The new Salt Lake City International Airport, or New SLC, features a beautiful new terminal, a parking garage with double the previous capacity and the initial portions of two new linear concourses. In September 2020, during a pandemic, the Salt Lake City Department of Airports opened phase one of a new generation of airport. Turning Vision Into Reality at Salt Lake City International Airport Six success strategies deliver phase one of the nation's newest hub airportīy Bill Wyatt, Executive Director | Salt Lake City Department of Airports
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |